Southern California Project

Initial power generation of project will deliver 49 MWe with goals of expansion to 200 MWe

01

Siginificant Resource Potential

Hotter at shallower depths

Temperature gradient >4F/ 100ft

Nearby areas have indicated lithium rich hectorite clay

02

Strategic Location

Access to nearby infrastructure such as electrical transmission lines

Potential buyers nearby

Phases

The project will be completed in five phases, progressing from exploration through commercial geothermal energy production, which is expected to begin in Year 5

Phase 1: 
Exploration

  • GeoAI resource targeting
  • PFI fracture and fluid mapping
  • Permitting
  • Exploration wells
  • Geo models
  • Identify minerals

Phase 2: 
Permitting and Planning

  • Obtain leases and permits
  • Complete engineering design
  • Select construction contractors
  • CAISO interconnection request
  • Power Purchase Agreement

Phase 3: 
Construction

  • Drill production, injection, and monitoring wells
  • Build power plant
  • Connect to electrical grid

Phase 4: 
Power Production

  • Start Power generation
  • Binary flash technology
  • Expected electricity sales: 323 GWh/ year

Phase 5: 
Critical Minerals

  • Design separation units and power plant expansion
  • Complete offtake agreements
  • Obtain permits
  • Construct and commission separation units and plant expansion
  • Timing to be determined in Phase 1

GeoRES has already taken the first steps towards geothermal power production in the Western United States by initiating strategic project planning

Identified more than 30 km2 of project area in Southern California

Obtained support commitments from local landowners

Assembled a superb team of highly qualified professionals for the company

Selected and arranged AI and advanced imaging technologies for exploration

Compiled initial field data

Completed desktop research and initial modeling

Completed detailed design of project including exploration

Developed pathway to expand project to 200MW capacity as the first step in a 1GWe portfolio

 